7 Site Prep Tips Before Hiring a Line Pump

Line pumps offer precision and flexibility, but success starts long before the concrete arrives. This guide outlines 7 essential site preparation tips, from assessing access and creating stable surfaces to confirming deliveries and ensuring safety compliance. With proper planning, you can streamline pours, reduce risks, and maximise efficiency. Urban Pumping’s expertise ensures every job is completed smoothly and to the highest standards.
Published on:
August 2025

A line pump remains a go-to choice for many concrete projects, offering flexibility, precision, and efficiency in tight or hard-to-reach spaces. Builders and homeowners alike rely on this equipment to streamline pours without compromising on quality or safety.

From clearing access routes to ensuring utilities are ready, the right preparation can make all the difference in how smoothly the job runs.

Here are 7 essential site prep tips that will help you avoid costly delays, enhance safety, and maximise the efficiency of your next line pump hire.

1. Assess Access to the Site

The first step to a smooth pumping day is making sure the pump truck can reach your site without difficulty. Tight driveways, low-hanging branches, or parked vehicles can all create avoidable delays. Taking time to check access early can save you from unnecessary stress later.

Walk the route the truck will take and measure any narrow entry points. If gates, fences, or other barriers are in the way, make arrangements to move or adjust them before the pump arrives. Think about turning space and safe positioning for the vehicle

Parking for the pump truck needs to be both convenient and safe. Ideally, it should be close to the pour area but not block essential site movement. The easier it is for the crew to set up, the quicker your project can move forward.

2. Prepare a Stable and Level Surface

An aerial view of a construction site where a concrete boom pump is pouring the foundation footings for a new building.

A solid, level base for the pump setup is essential for both safety and performance. Uneven or soft ground increases the risk of equipment shifting during operation, which can lead to accidents or poor results. Preparing the area ahead of time is well worth the effort.

If your site is sloped or bumpy, use gravel, compacted soil, or steel plates to create a steady platform. This ensures the pump operates at its best and minimises potential hazards. It also makes setup faster on the day.

Don’t overlook weather conditions. Heavy rain can soften soil, so plan ahead if you know wet weather is likely. Even small adjustments now can make the operation safer and more efficient.

3. Plan Hose Routing and Placement

A clear plan for hose placement keeps the pour running efficiently and reduces potential safety issues. The path should be as direct as possible, with minimal bends to maintain consistent concrete flow. This helps avoid unnecessary strain on the pump and crew.

Check for potential hazards along the route. Sharp corners, debris, or uneven surfaces can damage hoses or cause tripping risks. Protecting the hoses with covers or supports keeps them in good condition and improves site safety.

Involve the pumping crew in your plan if possible. Their experience can help refine hose positioning for the fastest and cleanest pour. Well-planned routing saves time and reduces the chance of last-minute changes.

4. Ensure Adequate Water Supply and Utilities

A residential water well system with a large black storage tank, a beige pressure tank, and a pump next to a house foundation.

Water is essential for priming the pump before the pour and cleaning it afterwards. Without a reliable supply, delays can occur, and the crew may need to bring additional equipment. Checking your site’s water access beforehand avoids unnecessary interruptions.

If your water source is far from the pump setup, consider temporary storage like tanks or drums. This ensures the team can work without constantly moving equipment to reach water.

While water is the main concern, don’t forget other utilities. If power tools or lighting are needed, make sure electricity is available and safe to use. A little planning ensures everything is ready when the crew arrives.

5. Clear and Secure the Work Area

A tidy worksite is a safer and more efficient one. Before the pump arrives, remove any materials, offcuts, or waste that could obstruct movement. This creates a safer environment for workers and protects the equipment from damage.

Keeping the site clear also means fewer delays. When crews can move freely, set up is faster, and the pour can begin on time. Make sure paths for both people and machinery are easy to navigate.

If your site is near public access or has multiple trades working, consider using barriers or signs. These keep the work area secure, reduce distractions, and help maintain a safe flow of activity.

6. Confirm Delivery and Pour Timing

A large, diverse construction crew in hard hats works together to assemble long sections of a red concrete pump pipe outdoors.

Coordinating the timing between the pump crew and concrete delivery is crucial. If one arrives too early or too late, one risks idle time, wasted product, and unnecessary costs. Clear communication with all parties helps keep everything on schedule.

Before the job day, confirm delivery times with your concrete supplier. Make sure they know the access details and the time the pump will be ready to start. This avoids confusion and keeps things running smoothly.

On the day itself, stay in touch with both crews. Even small delays can have a knock-on effect, so being ready to adjust ensures the pour stays on track.

7. Check for Safety and Compliance Requirements

Every site has safety standards, and high-risk work like concrete pumping demands full compliance. Meeting these requirements protects everyone involved and ensures your project avoids legal or regulatory problems.

Carry out a pre-job safety inspection of the area. Look for hazards such as exposed wiring, unstable scaffolding, or materials that could fall. Address these before the crew arrives to create a safe working environment.

If permits, safety plans, or inspections are required, make sure they’re ready. Having the right documentation in place keeps the job legal, safe, and stress-free from start to finish.

Common Site Prep Mistakes to Avoid

A high-altitude aerial view of a new house construction, showing a crane and a concrete pump pouring the basement walls.

Proper planning prevents costly mistakes on pumping day. Here are the most common site preparation errors to watch out for when getting ready for a line pump.

  • Poor access planning: Overlooking the space needed for the pump truck to manoeuvre into position can lead to awkward, unsafe setups. Tight turns or unexpected obstructions may cause delays, damage, or even the need for costly rescheduling.

  • Inadequate surface preparation: Choosing a setup location without assessing nearby environmental factors can compromise safety. Unstable ground near excavation edges or uneven surfaces beside traffic routes increase the risk of incidents and operational inefficiencies.

  • Neglecting hose routing: Failing to consider site activities around the hose path can disrupt the pour. Foot traffic, machinery movement, or overlapping work zones can create safety risks and slow overall progress significantly.

  • Lack of utility checks: Forgetting to confirm site services beyond water or power can create unexpected delays. Issues like restricted lighting, blocked drainage, or unavailable compressed air can impact pumping efficiency and worker safety.

  • Cluttered work area: Leaving stored materials, unused machinery, or temporary structures within the operational zone can restrict movement, obstruct visibility, and cause time-consuming adjustments during critical stages of the pour.

Why Preparation Pays Off with Urban Pumping

Screenshot of the Urban Pumping website, showing a large concrete pump truck and the tagline "Precision in Every Pour."

Getting the most out of a line pump hire starts well before the truck arrives, and that’s where Urban Pumping makes a difference. 

Our team brings experience that goes beyond operating equipment, offering practical advice to help clients avoid common oversights and keep projects on track. By working closely with customers during the planning stage, we ensure access, safety, and setup are all accounted for well in advance. 

This proactive approach reduces downtime, minimises the risk of costly delays, and helps the pour run as efficiently as possible. Whether it’s a small residential slab or a large commercial project, Urban Pumping’s focus on preparation ensures the pumping process is reliable and  fits seamlessly into the wider build schedule. 

Every job benefits from our attention to detail, well-maintained equipment, and a commitment to doing things right the first time. Choosing Urban Pumping means starting your concrete pour with confidence and finishing it without unnecessary complications.

Delivering Confidence With Every Pour

A successful concrete pour starts with careful preparation, dependable equipment, and a skilled team that understands the unique needs of your project. By focusing on safety, access, and efficiency, you can achieve consistent, high-quality results. 

Choosing Urban Pumping means working with professionals who prioritise precision and reliability. Contact us today for expert guidance, exceptional service, and the peace of mind that your line pumping job is in trusted hands.

Construction worker guiding concrete pump hose to pour slab foundation on rebar framework at building site.
7 Essential Safety Tips for Concrete Pumping Jobs
Safe concrete pumping is the foundation of efficient, reliable construction. Without proper planning and precautions, risks like hose whipping, blockages, and unstable setups can cause costly delays or injuries. This guide outlines seven essential safety tips every crew should follow, including site inspections, communication protocols, PPE, and emergency training. At Urban Pumping, safety comes first—we combine modern equipment with highly trained operators to protect your team and investment. With our commitment to safe, accurate pours, you can trust us to keep your project running smoothly.
Published on:
September 2025
See more
Concrete boom pump pouring slab on elevated construction site with workers spreading concrete across large foundation area.
8 Benefits of Boom Pumps for Large Concrete Jobs
When tackling large concrete projects, boom pumps are the smart solution. Their unmatched reach, speed, and flow control ensure efficient pours in high-rise, industrial, and complex layouts where precision matters. By reducing labour, improving site safety, and enabling faster completion, boom pumps save both time and money while delivering superior results. Urban Pumping combines advanced equipment with skilled operators to provide seamless boom pump hire across Victoria. Whether it’s a slab, footing, or multi-storey project, we help contractors achieve reliable outcomes with every pour.
Published on:
September 2025
See more
Small Job Concrete Pumping: Affordable Solutions for Residential Projects
Small job concrete pumping is the smart choice for homeowners who want reliable results without the heavy labour. From driveways and patios to garden features and slabs, pumping makes projects quicker, cleaner, and more cost-effective. This article explains when to use pumping, the difference between boom and line pumps, and how Urban Pumping keeps residential jobs affordable and stress-free.
Published on:
September 2025
See more

Get a Free Quote Today

Ready to pump? Hit us up for a no-obligation quote and see how we can make your next pour a breeze.
Get a Free Quote